· 3 min read

2025 Successes

Jan 24 2025

  1. Drafted optimized Data Science CV
  2. Reached out to ITCE connections for help
    1. Receive leads (George, Connor, Gloria)
  3. Reached out for help with DeepConnect estimate
  4. Took a walk after work
  5. Reviewed goal planning
  6. Drafted a Deep Connect technical development roadmap
  7. Complete ITCE “Support” and Single Article Pages
  8. Cancelled Azure subscriptions
  9. Created Huddly AI technical roadmap + detailed feature overview
  10. Applied to Vanderlande AI Consultant, SmartR Data Consultant, Judicial Council Data Engineer
  11. Analyzed Spending and created first draft budget
  12. Reached out to JC and Steph Ackermans to catchup

Jan 31 2025

  1. Setup Obsidian and took down DnD session notes and connections
  2. Made a detailed estimate for Huddly AI build
  3. Completed VAT returns on time

Feb 7 2025

  1. Applied to Eneco
  2. Estimated demo for HuddlyAI at $2500CAD
  3. Send scope for Huddly.ai
  4. Served and connected backend to frontend in railway.app
  5. Created frontend Vite connected to OpenAI LLM
  6. Closed Huddly demo deal by saying No, I can’t do more.
  7. Spoke dutch with Beata’s dad and for kattengras

Feb 14 2025

  1. Soft launch of ITCE website with request for feedback
  2. Processed feelings about Harm and identified vulnerabilities about self-love

Feb 21 2025

  1. ITCE website launch with audition signup and emails
  2. HuddlyAI time tracking + invoice
  3. Portfolio website start with graph node+link interface
  4. Apply for ITCE auditions

Feb 28 2025

  1. setup taal cafe in calendar
  2. reviewed calendar ahead of time!
  3. Cleaned the car
  4. Requested testimonials
  5. Updated MDI website
  6. Setup and used budget buckets (iteration!)
  7. Open and honest interview with Little Rocker
  8. Reviewed Jason’s website (Started colaboration)

Mar 07 2025

  1. Applied for AWS role
  2. Built Shexon demo in 4hrs
  3. fixed patio couch
  4. day trip to belgium
  5. setup landing page for sales funnel

Mar 14 2025

  1. Create demo for Shexon platform
  2. Started working with Graph Compose, created 2 nodes
  3. Aligned with Huddly on job role and supported kick off of figma design
  4. Record and share CSA Z662 ChatGPT video

Mar 21 2025

  1. Mapped out student user journey in job search. 3 interviews + Loom + Gamma for report.
  2. Up to speed with Graph Compose node building and APIs. Feeling comfortable.
  3. Setup CD/CI pipeline for Graph Compose
  4. Rebuilt Shexon demo front end
  5. Refurbished patio couch and tidied everything
  6. Managed time with alarms at ikea to accomodate Beata’s energy needs
  7. Totally nailed ITCE audition
  8. Drafted an updated Shexon demo SOW timeline estimate

Mar 28 2025

  1. build import script for EKG LLM
  2. Negotiated contract for CTO role with Huddly
  3. Completed student Surveys with Shexon
  4. Setup CI pipeline for GC
  5. Built Kling AI node for GC
  6. Identified consistency issues with GC node creation

Apr 25 2025

  1. First draft (v.3.6) tech architecture guidance doc for Huddly
  2. Start working with Beata for LinkedIn engagement
  3. Launch Huddly AI website
  4. EKG LLM data model completed for LLM testing
  5. Baldur’s Gate co-op play with Verana and Ray
  6. Close out and reflection discussion with Jason re: Graph Compose

May 02 2025

  1. Huddly public website live
  2. Huddly admin dashboard live
  3. Grant Capitalist potential project business development -> feeling confident and delivering just enough.
  4. Keeping track of time spent working.
  5. ITCE Alignment on project completion

May 09 2025

  1. Completed GrantCap PoC and demo
  2. Completed ITCE website project
  3. Estimated time and effort for Huddly features
  4. Created time estimation logging approach for dev time

May 27 2025

  1. Built MExit x Huddly demo in 8hrs.
  2. Aligend on equity and path forward
  3. Completed full restore and back generation -> timeMachine + manual system on optimized drive partitions.
  4. Sent draft development plan for Grant Cap + contract or agreement for hourly/lump sum approach. Aligned on next step and taking a break over the summer.

July 25 2025

  1. Call from Lotte at Konnekti to explore job opportunity -> networking from 6+ months ago coming to fruition
  2. Engaging and encouraging interns to complete landing page
  3. Getting demo 2 for WAGO (WISE) out to Tyrone. Basic selection logic and LLM

August 8 2025

  1. Completing WAGO PoC
  2. Honest conversation with Huddly about future (Konekti)
  3. Engaging more with friends on whatsapp + messenger (Lumley, Stephan)
  4. connecting with Klara and Oskar (Facetime calls)
  5. Redirection with Joey and introducing cats to each other

Other Interesting Curiosities